Abstract

One of the most important problems in project management is the time-cost trade-off problem (TCTP) that must be taken into consideration during project planning and control process through the use of suitable planning techniques. This study presented a model aims to solve (TCTP) using crashing as a traditional project planning technique and concurrency technique with activities partitioning in addition to new suggested technique that mixes between the two techniques and named as Concurrency-with Partitioning and Crashing Technique (CPCT). The model focuses on minimizing project time and cost and it is applied on an adopted case study. The results show that the suggested (CPCT) produces the best results for the two objectives compared to other applied techniques.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.