Abstract

Because the backfill of highway bridge embankment is not dense enough and the located in the hard and soft transition area, the big settlement that threats the safety of driving usually occurs when influenced by the impact load of high-speed vehicles. According to statistic of investigation of the accidents on certain highway, the difference between settlements in bridge abutment and bridge back is around 32mm to 100mm. This kind of big settlement difference is the main reason for bumping and other problems harming the operation of highway. In this paper we experimentally use horizontal bamboo bars used in the construction of side bridge embankment to deal with the continuous backfill settlement, which is effective. Bar pile to treat the settlement of highway embankment backfill is one of the economical, reliable and effective treatment without constructional occupation of driving lanes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.