Abstract

The excavation blasting is required for the rock pit of a steel plant in Huangshi city. Due to the chimmey and pool of in-situ concrete foundation are close to the complex environment blasting area, the small hole bench blasting, hole by hole blasting technique were adopted, the reasonable network parameters and millisecond delay time were investigated. Meanwhile the blasting hole was covered for protection. It is shown that the proposed solution can decrease blasting vibration but also control the fly-rocks. The rock blasting effect is favorable and the blasting purpose is achieved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.