Abstract
The habitat suitability model is coupled with the two-dimensional high-precision hydrodynamic model in this paper. In the model, finite volume method (FVM) with Godunov type is adopted to solve the two-dimensional hydrodynamic process, which has good robustness and second-order temporal and spatial accuracy; Habitat suitability model is constructed by habitat suitability index based on IFIM theory. Meanwhile, the introduction of GPU acceleration technology greatly improves the simulation efficiency. Combined with the results of River2D, the results of this model have good accuracy. The model was applied to simulate the spawning habitat of Gymnocypris eckloni in the lower reaches of a hydropower station in the Upper Yellow River, and the reasonable discharged flow of hydropower station required for a good spawning habitat was 74 m3/s. It increased by 53.377% compared with the average annual discharge in May of the natural river. The evaluation of the spawning habitat of Gymnocypris eckloni provides a scientific basis for protecting the integrity of river ecosystem in this paper.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.