Abstract
Abstract. Six sigma method widely applied in production and service businesses is known as a project-oriented method. In six sigma method, selection of the prior project among others can be considered as a multi -criteria decision making problem. The conducted literature review has revealed that there is a large number of methods to select six sigma projects. It is more appropriate to use fuzzy multi-criteria decision making methods in project selection since evaluation criteria of six sigma projects include uncertainties. The aim of this study is to select the most appropriate project as a result of evaluating the projects by Fuzzy VIKOR, Fuzzy TOPSIS and Fuzzy COPRAS as methods of fuzzy multicriteria decision-making and integrating the ranking scores obtained from each method by Copeland method. The proposed method has been implemented in a large scale production company, operating in Aydin ASTIM Organized Industrial Zone. Keywords. Six Sigma Projects, Fuzzy VIKOR, Fuzzy TOPSIS, Fuzzy COPRAS, Fuzzy AHP, Copeland Method. JEL. M11, C44, L20, C02, D70, O22.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.