Abstract

In distribution system, bus load estimation is complicated because system load is usually monitored at only a few points. As a rule receiving nodes are not equipped with stationary measuring instruments so measurements of loads are performed sporadically. In general, the only information commonly available regarding loads, other than major distribution substations and equipment installations, is billing cycle customer kWh consumption. In order to model system uncertainty, inexactness, and random nature of customers' demand, a fuzzy system approach is proposed. This paper presents application possibilities of the fuzzy inference method to the electrical load modeling. Clustering of load profiles in different part of system was used to classify the substations. A regression model, expressing the correlation between a substation peak load and a set of customer features (explanatory variables), existing in the substation population, is determined. Simulation studies have been performed to demonstrate the efficiency of the proposed scheme and an effect of different parameters on its accuracy on the basis of actual data obtained at distribution system substations.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.