Abstract

Construction of elevated corridor metro rail projects involves activities like piling works, pier construction, segment casting, segment transportation, segment erection with launching girder and pre-stressing operations for joining the segments which are risky in nature and need to be implemented very carefully. This paper is an attempt to develop a risk index for the elevated corridor for metro rail construction project in western India. The risk index is developed by application of fuzzy analytic hierarchy process (FAHP) to the quality parameters associated with the piling works, pier construction, segment casting, transportation and erection. This risk index would help the project authorities to identify the most risky activities and plan accordingly the suitable risk mitigation measures. This would help the project to be completed successfully within stipulated time and cost frame. The risk index developed would act as a guide for developing risk management strategies for the future metro rail construction projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.