Abstract

Based on solving maximum income model of hydropower plant and forming original bidding strategy, this paper used price coefficient to amend the original bidding strategy. Then it used the fibonacci method to obtain. Finally, it found the best stragety. The proposed stragety can coordinate the consumption of water in various period、 the relationship between water and quotation, it meet the constraint of water availability of plant and realize its optimal operation in the form of output-bidding, it also avoided the waste of water, then it insured the maximum income of the plant. Finally, a concrete example is given in detail to validate the practicability of the model and algorithm

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.