Short-term hydro-thermal scheduling aims to obtain optimal generation scheduling of hydro and thermal units for a one-day or a one-week scheduling time horizon. The main goal of the problem is to minimize total operational cost considering a series of equality and inequality constraints. The problem is considered as a non-linear and complex problem involving the valve-point loading effect of conventional thermal units, the water transport delay between connected reservoirs, and transmission loss with a set of equality and inequality constraints such as power balance, water dynamic balance, water discharge, initial and end reservoir storage volume, reservoir volume limits and the operation limits of hydro and thermal plants. A solution methodology to the short-term hydro-thermal scheduling problem with continuous and non-smooth/non-convex cost function is introduced in this research applying dynamic non-linear programming. In this study, the proposed approach is applied to two test systems with different characteristics. The simulation results obtained in this paper are compared with those reported in recent research studies, which show the effectiveness of the presented technique in terms of total operational cost. In addition, the obtained results ensure the capability of the proposed optimization procedure for solving short-term hydro-thermal scheduling problem with transmission losses and valve-point effects.
Highlights
Power systems are faced with a series of challenging issues taking into account the advances and improvements within them
A simplified pseudo-code is provided in Figure 1 for introducing the application of OQNLP to find the optimal solution of the optimization problems, which is divided into two levels
As it can be seen in this table, the minimum total operational cost reported for this case is $914,660.00, which is obtained by applying FAPSO [39]; the proposed method in this paper obtained the minimum cost equal to $901,191.9735, which shows the capability of the proposed method in obtaining optimal solution of the STHS problem for test system 1, case 2 with respect to other optimization methods
Summary
Power systems are faced with a series of challenging issues taking into account the advances and improvements within them. The STHTS problem is proposed as a complex non-linear, non-convex and non-smooth optimization problem considering the water transport delay between connected reservoirs, the valve-point loading effect related to the thermal units, transmission loss and many equality and inequality constraints [13,14]. In [18], a hybrid method differential evolution with adaptive Cauchy mutation is utilized to obtain the optimal generation scheduling of hydro and thermal units, in which water transport delay between connected reservoirs and the effect of valve-point loading of thermal power plants is taken into account. Optimal solutions obtained in this paper ensures the capability of the proposed method to deal with valve-point loading effect of thermal units and system power transmission loss.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.