Abstract

The dependency structure matrix (DSM) has been identified as an apt tool to represent information flows between activities. Using this representation, information dependency attributes can be organized and analyzed in a structured manner to identify activity groups and sequences for concurrent execution. Current DSM methodology requires significant efforts from the experts to estimate information dependency attributes. The methodology can be more widely used if the estimating efforts are reduced. This paper proposes two concepts to reduce the estimating efforts required for the DSM methodology. The first concept reduces the number of information dependency ratings required and the second concept reduces the effort to estimate the rating. The proposed concepts are structured into a procedure. This procedure is applied to the design phase of an induced draft cooling tower (IDCT) project and discussed. The paper also discusses the shortcomings and future directions of the present approach and concludes that the present approach is applicable in IDCT projects and can be extended to other types of projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.