Abstract

This paper describes a methodology for coordinating the mid and short-term scheduling of hydrothermal systems. The technique is able to translate the electrical problems at the short-term level into a constraint to be added to the mid-term scheduling problem. This constraint, called a Benders cut, only refers to weekly target variables in the mid-term problem. The Benders decomposition therefore allows a feedback between the short-and mid-term models with only a few modifications required in the specialized algorithms used at each level. A case study with the Brazilian Southeast Network is presented and discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.