Abstract

In the SCADA system monitoring, control and over-limit alarm processes from the hydroelectric power plants cascade (on the Cris river) have been obtained a large amounts of historical data stored in a database. But in their preliminary form these data don't mean a performance management. Data mining techniques applied over historical acquired data are used to extract hidden management information directly from the SCADA system's database records. This paper presents a data mining framework for the historical data of an industrial measurement and control system and establishes a data mining flow.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.