Abstract
Based on soft and crumbly surrounding rock of roadway, poor integrity of roof, drench water in roadway, the large in-situ stress and other complex conditions, this paper analyzes the cause of roadway destruction and grouting strengthening mechanism, using the coupling of grouting technique to integrated strengthening for the region. Engineering application shows that the integrated strengthening effect is obvious, and the economic and technique effectiveness is remarkable. The successful application of secondary coupling grouting technology provides the reference for the mine laneway construction of similar geological conditions.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.