Abstract

In this paper, we study a group shop scheduling (GSS) problem subject to uncertain release dates and processing times. The GSS problem is a general formulation including the other shop scheduling problems such as the flow shop, the job shop, and the open shop scheduling problems. The objective is to find a job schedule which minimizes the total weighted completion time. We solve this problem based on the chance-constrained programming. First, the problem is formulated in a form of stochastic programming and then prepared in a form of deterministic mixed binary integer linear programming such that it can be solved by a linear programming solver. To solve the problem efficiently, we develop an efficient hybrid method. Exploiting a heuristic algorithm in order to satisfy the constraints, an ant colony optimization algorithm is applied to construct high-quality solutions to the problem. The proposed approach is tested on instances where the random variables are normally, uniformly, or exponentially distributed.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call