Abstract
There are a large number of hazard sources in the construction site, and each hazard source may cause a safety accident. Therefore, timely and accurate identification of hazard sources becomes a necessary for safety management at the construction site. Along with the characteristics of the construction site of the Maozhou River Rehabilitation Project, from the four aspects of management, people, environment and objects, the causal analysis method is used to analyze the hazard sources of safety accident at the construction site. According to the analyzed hazard sources, the total safety management of the project was realized through the PDCA cycle.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.