Abstract

This paper proposes a methodology for the load shedding scheme for electrical power system by using the Analytic Hierarchy Process (AHP). The process AHP is a structured technique for dealing with complex decisions. In this paper, an effective method that can solve a multiple criteria and multiple objective decision-making problems was introduced to the load shedding scheme in electrical power system problem in order to gain a scientific and objective maintenance scheduling. Firstly an AHP model is built up on the base of analyzing correlative factors with an example given to indicate how the AHP is applied.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.