Abstract

An application is presented of a new methodology for the real-time operations of river-reservoir systems. The methodology is based upon an optimization/simulation modeling approach that interfaces optimization with a one and/or two-dimensional unsteady flow simulation model (U.S. Army Corps of Engineers HEC-RAS). The approach also includes a model for short-term rainfall forecasting, and the U.S. Army Corps of Engineers HEC-HMS model for rainfall-runoff modeling. Both short-term forecasted rainfall in addition to gaged streamflow data and/or NEXRAD (Next-Generation Radar) can be implemented in the modeling approach. The optimization solution methodology is based upon a genetic algorithm implemented through MATLAB. The application is based upon the May 2010 flood event on the Cumberland River system in the USA, during which releases from Old Hickory dam caused major flooding in the downstream area of Nashville, TN, USA, and allowed the dam to be placed in an emergency operational situation. One of the major features of the modeling effort and the application presented was to investigate the use of different unsteady flow modeling approaches available in the HEC-RAS, including one-dimensional (1D), two-dimensional (2D), and the combined (1D/2D) approach. One of the major results of the application was to investigate the use the different unsteady flow approaches in the modeling approach. The 2D unsteady flow modeling, based upon the diffusion wave approach, was found to be superior for the application to the Cumberland River system. The model application successfully determined real-time operations that would have maintained the flood water surface elevations at the downstream control point in Nashville below the 100-year return period river water surface and maintaining the gate openings at the Old Hickory Dam from reaching an emergency operational situation, which could have caused major losses at the dam.

Highlights

  • Real-time flood operation of river-reservoir systems is a very severe problem all around the world

  • The Cumberland River application of the optimization/simulation for optimal operation of the gates at Old Hickory Dam only considered one control point, which was located at Nashville

  • An optimization/simulation model has been developed to determine the optimal operation of gates before, during, and after flooding events

Read more

Summary

Introduction

Real-time flood operation of river-reservoir systems is a very severe problem all around the world. The modeling approach developed and tested in Albo-Salih and Mays [6], which is the basis for the application is based upon an optimal control approach which interfaces simulation models for rainfall-runoff analysis (HEC-HMS), an unsteady flow simulation model (HEC-RAS) for simulating one-dimensional (1D), two-dimensional (2D), or combined 1D and 2D unsteady flows through a river-reservoir system, a model for reservoir operation defining gate operations, and a short-term rainfall forecasting model This new modeling approach has been designed for the real-time operations of reservoir gate operations in river-reservoir systems to minimize flooding conditions. Other models have been developed recently for real-time flood control, but lack the capabilities of the model discussed and applied especially an optimization model and the capability of the model to handle both the combined 1D and 2D approaches, or just the 2D approach

Cumberland River Basin
Location and purposes purposes in in the the Cumberland
Rainfall
Operation of Old Hickory
Model Application to the Cumberland River System
Model Set-Up
Portion
Solution Process
Operations of Old Hickory Dam
Unsteady
Simulated
Comparison of Simulation Scenarios
Comparison of Optimizied Operations
12. Optimized
13. Comparison
14. Optimized
15. Actual
Findings
Discussion
Conclusions