Abstract
A commissioning unit with an energy management system (EMS) was developed to be used together with facility monitoring and control systems (FMCS). This paper describes the testing of the new coupling system, in which a detailed management program is embedded for real time control decision making. First, a survey was conducted to evaluate the current power consumption of the facility systems, and found that HVAC is the most energy intensive system. Then a case study was performed, while the plant was in operation, to demonstrate the feasibility of the new coupling system, and a 9.6% chiller efficiency increase and total 23.2% annual energy saving for the chillers were reached, by optimizing the part load ratio condition of chillers and pumps. The results from in situ experiments show that applying this energy management system to the IT industry is feasible. A better custom-made FMCS with EMS, and full scale testing to greatly increase the overall energy efficiency, is recommended.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.