Abstract

The aim of unit commitment problem in power systems has been converted from cost minimization to profit maximization with the liberalization of power markets. The generation companies (GENCOs) schedule the units to maximize their profit for the forecasted prices in day ahead market (DAM). The generation scheduling of generators in deregulated environment is called as Profit Based Unit Commitment (PBUC). In this paper, an application of Analytic Hierarchy Process (AHP) is proposed to solve PBUC problem. The method is applied to 3-units power system. The results are compared with the methods in the literature. As shown in the study, the proposed AHP method introduces its applicability and efficiency for solving the unit commitment problem in a day ahead market.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.