Abstract
Bridges monitor and control plays a important part in the bridge construction technology. Besides, It is the key factors of ensuring the bridge construction safety in the construction project and meeting design and construction code requirements. The Article takes a high-speed railway bridge as engineering background, and adaptive control system will be applied to the monitoring measurement. The Main Parameter of construction is proposed, which is based on the sensitivity analysis of design parameter in theory. According to take elastic modulus and volume weight of concrete as the main Parameters, identified and adjusted them by least square method, to forecast errors, analyze and adjust parameters. Using the adaptive control system to collect the data of displacement and stress in bridge construction.Calculate through the Computer simulation model, and obtain initialize height during construction, on this basis, guiding the construction and complete the construction of control successfully.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.