Abstract

Background. Additional exploration of oil and gas reserves requires the application of information technologies for modelling all technological processes and interpreting the results of geophysical well logging. Reliable models of the object under exploration and the use of best practices in the field of information systems reduce investment risks associated with planning exploration works, at the same time as optimizing the planning and design of the entire process of field development.Aim. Optimization of the selection process of multivolume, multiparameter logging data when modelling a complex oil reservoir at the stage of additional field exploration, grouping well data by quality, completeness and uniformity of their distribution over the study area, as well as identifying inaccuracies (errors) in the field data (registration of signals in probes, errors in measurements of directional survey, borehole picks, etc.).Materials and methods. Examples of well logging interpretation for a complex reservoir are given, along with its distribution options for a constructed lithology cube (2D, 3D) based on the data obtained during drilling from one pilot borehole – a horizontal well, a sidetrack and a directional well. It was established that the data obtained when distributing the reservoir and modelling the lithology cube of a complex development target can be significantly different for wells located close to each other. The results obtained when constructing 2D and 3D models by different specialists revealed discrepancies in the interpretation and cross-well correlation of well sections.Results. Local zones with a sharp change in the structure were established, in particular, the concentration of extrema around some wells. The presence of such anomalies points to the presence of wells, for which the values of stratigraphic depth marks for wells located close to each other are quite different. A geostatistical algorithm was applied to correct the well data using the “sliding window” method, which became a solution for the most accurate determination of the depths of the object under exploration.Conclusions. The possibility of using a geostatistical algorithm for correcting well data based on multiparameter geophysical data was assessed; the current state of modelling the processes of exploration and development of oil fields with a complex geological structure was analysed.

Highlights

  • Additional exploration of oil and gas reserves requires the application of information technologies for modelling all technological processes and interpreting the results of geophysical well logging

  • Examples of well logging interpretation for a complex reservoir are given, along with its distribution options for a constructed lithology cube (2D, 3D) based on the data obtained during drilling from one pilot borehole – a horizontal well, a sidetrack and a directional well

  • It was established that the data obtained when distributing the reservoir and modelling the lithology cube of a complex development target can be significantly different for wells located close to each other

Read more

Summary

НА ЭТАПЕ ДОРАЗВЕДКИ МЕСТОРОЖДЕНИЯ

На современном этапе освоения месторождений нефти и газа, находящихся на стадии доразведки, решающая роль отводится применению информационных технологий и цифрового моделирования всех технологических процессов и интерпретации результатов геофизических исследований скважин (ГИС). Цель — оптимизация процесса селекции многообъемных, многопараметровых данных ГИС при моделировании сложнопостроенной нефтяной залежи на этапе доразведки месторождения, группировка скважинных данных по качеству, полноте и равномерности их распределения по площади исследуемого участка, выявление возникающих неточностей (ошибок и погрешностей) в промысловых данных (регистрация сигналов в зондах, погрешности в измерениях инклинометрии, скважинных отбивках и др.). В работе авторы приводят примеры интерпретации ГИС для сложнопостроенной залежи и варианты распределения коллектора для построенного куба литологии (2D, 3D) на основе данных, полученных при разбуривании из одного пилотного ствола — горизонтальной скважины, бокового ствола и наклонно-направленной скважины. Установлено, что при распределении коллектора и моделировании куба литологии сложнопостроенного объекта разработки для скважин, расположенных близко друг к другу, полученные данные могут существенно отличаться. Приведен анализ использования многопараметровых геофизических данных с использованием геостатистического алгоритма коррекции скважинных данных, проанализировано современное состояние моделирования процессов разведки и разработки нефтяных месторождений со сложным геологическим строением

Известия высших учебных заведений
Proceedings of higher educational establishments
Геологоразведочные работы по выявлению
Geological exploration works to identify and map
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call