Abstract

Abstract As part of the on-going risk assessment of Ontario Hydro's Bruce ‘B’ nuclear generating station, fault tree analyses for the boiler feedwater system and the inter-unit feedwater tie system were performed. The process fault trees were constructed using the expert system PC Fault Tree Aide. The experience gained from this exercise, the problems encountered and the benefits realized are described in this paper.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.