Abstract
The paper studies some problems for actual construction process of Xinchang electric-factory bridge in Nanchang. The paper analyses the parameters of construction control, with the aim of introducing the theory of Artificial Neural Network (ANN), which is the most modern prediction theory, into long span prestressed concrete girder bridge construction control.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have