Abstract
Aiming at the optimization problem of shortest time limit - resource leveling, the paper first introduces Evolutionary Programming (EP) to solve it, and a new modified method based on evolutionary programming is proposed: the mutation operator of EP is improved by using the theory of Simulated An-nealing (SA), and without using repair operator. Then use Genetic Algorithm (GA), EP and the modified EP to solve this problem, the experimental results indicate that EP can optimize this problem effectively, and EP has better opti-mization performance than GA. The average evolution generation decreased significantly in the modified EP to approach the optimal solution, the variance after optimization decreases 42.64%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.