Abstract

AbstractThis paper presents the application and comparison of metaheuristic techniques to reactive power planning (RPP) problem which involves optimal allocation and combination of to‐be‐installed VAr sources to satisfy voltage constraints during normal and contingency states for multiple load levels. The main objective of the proposed RPP problem is to minimize the investment cost through balanced installation of SCs and SVCs while keeping a specified security level and minimizing the amount of load shedding. The problem is formulated as a large scale mixed integer nonlinear programming problem, which is a nonsmooth and nondifferentiable optimization problem using conventional optimization techniques and induces lots of local minima. Among the metaheuristic techniques, genetic algorithm (GA), particle swarm optimization (PSO) and evolutionary particle swarm optimization (EPSO) are applied to solve the RPP problem. To investigate the effectiveness of the metaheuristic techniques, the proposed approaches have been successfully tested on IEEE‐14 buses, as well as IEEE‐57 buses test system. The results obtained are compared and the effectiveness of each technique has been illustrated. Copyright © 2008 Institute of Electrical Engineers of Japan. Published by John Wiley & Sons, Inc.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call