Abstract
Pile foundation thermal response test method was adopted to measure the heat transfer capacity of the pile foundation U-pipe heat exchanger. The heat pump system of pile foundation buried pipe was designed. BIN method was adopted to calculate the annual dynamic load of office in Shanghai and annual energy consumption, and its energy-saving effect was determined by comparing with the air-cooled heat pump air conditioning system. Finally, annual cost method was employed to study the investment and annual operating expenses of pile foundation buried pipe heat pump air conditioner systems, and their economy, advantages and disadvantages by comparing with those of the air-cooled heat pump air conditioning system were analyzed.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.