Abstract

In this paper, an applicable method is introduced to install the wind and solar hybrid power in existing power system. Instead of using complex calculation, we performed the installation process based on the domain-link method. In order to testify the operation characteristics of power system after introduce wind and solar power, the maximizing decision method is applied to examine the operation condition by the targets of environment, economy, load and security. From the viewpoint of testing entire power system, except for the selected buses, all buses in system are also examined by synthetic target. The main advantage of this method is that it may be used in the power system both under planning and operation; and the installation site may be easily redetermined to obtain the appropriate weather condition for wind and solar power. The method introduced in this paper may be also used in large scale power system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.