Abstract
This paper presents the applicable methods to connect industrial park load and renewable energy to a small-scaled power system. The connecting procedure consists of three items namely Optimal Order and Domain-Link Method and Weakness Degree in Energy Supply (WDES) as well. The optimal order makes dispersed hydropower and thermal power first developed to improve P-V nodes and capacity of small power system. The domain-link method can selects more stable buses that have multi-branch of power supply in order to connect industrial park and renewable energy. WDES shows weakness information of each bus to avoid connecting industrial park load and renewable energy to unstable buses in practical operation. To testify the operational characteristics, the system power flow is used to indicate the margin of buses voltage and carrying capacity of power lines after introducing industrial park and renewable energy. To elaborate on the application process in detail, this paper takes the several diagrams and tables as the theoretical basis and makes the all connection process more systematic.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.