Abstract

Partial nitrification and partial denitrification combined with anammox is a promising process for sewage treatment. In this study, real municipal wastewater was treated in a continuous two-stage anoxic/oxic (A/O) reactor. External mixed sludge fermentation products were added in the anoxic zone, simultaneously achieving partial nitrification and partial denitrification and achieving a high and relatively stable accumulation of nitrite. The maximum accumulation rates of NO2−-N in A1.2 and A2.1-A2.4 zones of the reactor reached 70% and 61%–37%, respectively, which improved denitrification efficiency and created conditions that supported the coupling of subsequent anammox. The influent nitrogen load of the system was 0.078 kg/(m3•d), and the mean influent and effluent total nitrogen were 51 and 12 mg/L, respectively. The mean total nitrogen removal rate reached 76%. Further analysis revealed that Hyphomicrobium (incomplete denitrifiers) and Nitrosomonas (ammonia oxidizing bacteria) were enriched, which may have facilitated the high nitrite accumulation. Moreover, the batch test showed that adding sludge fermentation during denitrification significantly suppressed nitrite reduction, resulting in the nitrite accumulation.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call