Abstract

Significant differences have been identified in loss of offsite power (LOSP or LOOP) event description, category, duration, and applicability between the LOSP events used in NUREG/CR-6890 and ENS’ LOSP packages, which were based on EPRI LOSP reports with plant-specific applicability analysis. Thus it is appropriate to reconcile the LOSP data listed in the subject NUREG and EPRI reports. A cross comparison showed that 62 LOSP events in NUREG/CR-6890 were not included in the EPRI reports while 4 events in EPRI reports were missing in the NUREG. Among the 62 events missing in EPRI reports, the majority were applicable to shutdown conditions, which could be classified as category IV events in EPRI reports if included. Detailed reviews of LERs concluded that some events did not result in total loss of offsite power. Some LOSP events were caused by subsequent component failures after a turbine/plant trip, which have been modeled specifically in most ENS plant PRA models. Moreover, ENS has modeled (or is going to model) the partial loss of offsite power events with partial LOSP initiating events. While the direct use of NUREG/CR-6890 results in SPAR models may be appropriate, its direct use in ENS’ plant PRA models may not be appropriate because of modeling details in ENS’ plant-specific PRA models. Therefore, this paper lists all the differences between the data in NUREG/CR-6890 and EPRI reports and evaluates the applicability of the LOSP events to ENS plant-specific PRA models. The refined LOSP data will characterize the LOSP risk in a more realistic fashion.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call