Abstract

The Fermilab Recycler Ring (RR) is intended to be used as a future antiproton storage ring for the Run II proton-antiproton collider operation. It is proposed that about 40mA of antiproton beam from the Accumulator Ring will be transferred to the Recycler once for every two to three hours, stacked and cooled. This operation continues for about 10 to 20 hours depending on the collider needs for antiprotons. Eventually, the cooled antiproton beam will be unstacked from the Recycler and transferred to the Tevatron via the Main Injector. We have simulated stacking and unstacking of antiprotons in the Recycler using multiparticle beam dynamics simulation code ESME. In this paper we present results of these simulations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.