Abstract

This report summarizes a set of calculations for the antiproton production in a complex composed of target area, collector, separator, beam line and collector ring for the antiproton source of the future FAIR facility (Facility for Antiproton and Ion Research) at GSI, Darmstadt, Germany. The emphasis is on the optimization of the accumulation rate of antiprotons in order to maximize the luminosity of experiments with cooled antiproton beams in the High Energy Storage Ring (HESR). Results of simulations for each component of the antiproton production complex are presented in order to identify the present limitations of the antiproton production rate.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.