Abstract

To meet the requirements of foundation bearing capacity, end bearing piles are adopted by most of the Sluices built on soft soil foundations. However, after the completion of the sluice, there will be settlements on both sides of the backfill, which will result in base cavity, form water seepage channels, and endanger the buildings and dams. In this paper, a new steel sheet pile diaphragm wall scheme is proposed to resit seepages under this situation. Steel sheet pile diaphragm walls are disposed on the river side of the building and connected with the chamber floor to prevent wound infiltration and sliding sideways. The practical results show the effectiveness of the proposed scheme.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.