Abstract

This paper proposes a methodology for placement of sectionalizing switches in distribution networks in the presence of distributed generation sources. The multiobjective considerations are handled using a fuzzy approach. The primary objective is reliability improvement with consideration of economic aspects. Thus, the objectives are defined as reliability improvement and minimization of the cost of sectionalizing switches. A fuzzy membership function is defined for each term in the objective function according to relevant conditions. Some considerations incorporated in the proposed model are relocation of existing switches and operating constraints on distribution networks and distributed generation (DG) sources during post-fault service restoration. The ant colony optimization (ACO) algorithm is adopted to solve the fuzzy multiobjective problem efficiently. The performance of the proposed approach is assessed and illustrated by various case studies on a test distribution system and also a real distribution network.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.