Abstract
A new mathematical model for software engineering project scheduling was proposed.The model took into consideration the over-time of software engineers,which was regarded as a flexible work-hour constraint.The project human resources were analyzed in detail.As a type of special renewable resource,the human resource was added as a new constraint to the traditional resource constrained project scheduling problem.An ant colony algorithm based on parallel schedule generation scheme was suggested to solve this new flexible work-hour constrained project scheduling problem,and an instance was used to verify and analyze the solution.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.