Abstract
This paper investigates a multi-stage hybrid flow shop scheduling problem in a real-world printed circuit board (PCB) assembly shop. Some distinct characteristics such as calendar constraints, sequence-dependent setup times, unrelated parallel machines and stage skipping are taken into account. Besides, lot-sizing is introduced to split an order of PCBs into a number of smaller sub-lots to improve the utilization of the assembly lines. This article develops an effective hierarchical approach to reduce the complexity of such a complicated PCB scheduling problem by decomposing it into two highly coupled sub-problems of job sequencing and batch scheduling with lot-sizing. A two-stage ant colony algorithm with lot-sizing is proposed to evolve best results for makespan criterion. Extensive computational experiments have been conducted to compare the performance with two other algorithms. The results demonstrate that the proposed two-stage ant colony algorithm with lot-sizing is competitive in terms of computational result, computational time and stability.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.