Abstract

In order to solve the difficulty of the arrangement of ore production at each mine site during the transition from open pit to underground mining in Shirengou iron mine. Taking the largest amount of mining as the objective function, each deposit storage capacity, ore dilution rate, ore loss rate and grade as the constraints, thus the linear programming model was established and solved by lingo considering the balance between reserve and production ratio. The optimal number of each mining area mining was obtained, providing a theoretical basis for raising the overall economic benefits of mining transition period.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.