Abstract

ABSTRACT Previous studies developed models to predict final construction cost (FCC) values based on many inputs, which makes them difficult to use. However, relying on models with relatively few inputs will reduce the accuracy of the prediction results. This paper aims to develop an artificial neural network (ANN) model to predict the FCC based on contract cost (CC), contract duration, and project sector at an early stage of a project. The data collected and used for the ANN model was 135 Saudi Arabian construction projects. The Zavadskas and Turskis logarithmic approaches, and the Pasini method were utilized to overcome the limited data. Then, the ANN model was developed through two stages. The purpose of the first stage was to enhance the data by identifying the abnormal data using absolute percentage errors (APE). The enhanced data was used to develop the ANN in the second stage. The finding showed that the ANN model provided an average MAPE (mean absolute percentage error) of 18.7%. The MAPE of the ANN model is decreased to 8.7% on average by deleting data with an APE higher than 35%. The model allows stakeholders to evaluate the financial importance of potential risks and develop appropriate risk management strategies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.