Abstract

The nuclear power crane possesses strict safety requirements. Based on the special structure of its hoisting mechanism, it has two sets of independent lifting ropes to drive a hook synchronously and two pressure buffer devices on both ends of winding system’s balancing lever, in order to play protective roles and increase its working reliability. The flexible multi-body dynamics model which coupled mechanism and structure of the nuclear power crane is constructed when broken accident of rope occurs in the lifting process from the ground or smooth lifting. The importance of a buffer damping device installed in crane hoist mechanism has been proved through the vibration simulation about wire rope at the failure state. And the vibration of mechanism and the main girder structure is remitted and controlled at the time of failure in operation. The most important advantage is that has improved the safety of nuclear power crane.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.