Abstract
This study investigated the reasons for project failures and cost overruns in building construction. The building construction industry is well known for chronic issues such as fragmentation, cost overruns, poor working conditions, and insufficient quality, all of which result in project failure. Project failure and cost are the two most essential indicators of success in a construction project because they have an equal impact on all project participants, both favorably and negatively. These problems have been evident for many years across the global construction industry, requiring the identification of the primary causes to address these challenges. The use of both quantitative and qualitative approaches was important, as it made it easier to accomplish the overall goal of solving the problem because quantitative data were collected via surveys and qualitative data were collected through interviews. Data was gathered from 104 team members in Pakistan's building construction industry. The top five reasons for project failure were poor project management, poor design, frequent design changes, design errors, bureaucracy, corruption, poor quality, and poor site management. The top five reasons for cost overruns were poor start-up planning, poor project cost estimation, poor weather conditions, political situations, and the economic instability of the country. Minimizing these factors can contribute to a greater probability of project success and overall improvement in the construction industry.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
More From: Pakistan Journal of Humanities and Social Sciences
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.