Abstract

Abstract: This study provides a thorough examination of frequently occurring Engineering, Procurement, and Construction (EPC) contract provisions that have resulted in legal disputes under the purview of the National Highways Authority of India (NHAI). This study intends to identify and examine the specific contractual clauses that have been the focus of legal issues in NHAI projects by drawing conclusions from a thorough assessment of High Court judgements. The study clarifies the underlying factors and ramifications of these conflicts, providing insightful viewpoints for those involved in the infrastructure and construction industries. This paper provides a platform for improving and strengthening EPC contracts to reduce potential conflicts and improve project execution efficiency by looking at the legal precedents.30 judgment from 2012 to 2021 were collected from Highcourt and identified recurring EPC contract clauses leading to court cases.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.