Abstract

For the Isotope Decay At Rest (IsoDAR) experiment in neutrino physics (searching for sterile neutrinos), we have developed a novel compact isochronous cyclotron with direct injection through an axially embedded RFQ. For IsoDAR to be decisive within five years of running, 10 mA of protons, cw at 80% duty factor are needed on a neutrino production target. To alleviate space charge in the cyclotron driver, we accelerate 5 mA of , to be broken up into 10 mA of protons after extraction from the cyclotron. An open question that we are answering with this paper is whether the beam losses from gas-stripping (the removal of electrons from through the interaction of the beam ions with the residual gas in the accelerator) are going to be a significant challenge. Using a newly added feature to the well-established Object-Oriented Parallel Accelerator Library code, we calculate gas-stripping losses in the IsoDAR cyclotron using realistic beam distributions, magnetic fields, gas composition, and pressure. We show that to maintain losses due to dissociation below 1% over the entire acceleration region, a vacuum of at least 6 × 10−7 mbar is required.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.