Abstract

This letter proposes an analytical expression on transient overvoltage peak value caused by DC blocking (DCB) and commutation failure (CF). The proposed method can obtain the transient overvoltage risk without modeling the complex AC/DC hybrid system. The method only requires the equivalent parameters of the AC system and the operation parameters of the DC system to effectively calculate the overvoltage without using the dynamic simulation software. The simulation results verify the effectiveness and correctness of the proposed method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.