Abstract
F3-30 is the low-bypass-ratio turbofan engine developed to power the T-4 intermediate trainer for the Japan Air Self Defense Force (JASDF). The actual field service was started in September, 1988. The program to extend time between overhaul (TBO) of the F3-30 has been running. Analytical condition inspection (ACI) and accelerated mission testing (AMT) were conducted to confirm the sufficient durability to extend TBO. Most deteriorations of parts and performance due to AMT were also found by ACI after field operation with approximately same deterioration rate. On the other hand, some deteriorations were found by ACI only. These results show that ACI after field operation is also necessary to confirm the TBO extension, though AMT simulates the deterioration in the field operation very well. The deteriorations which would be caused by the field operation during one extended-TBO were estimated with the results of ACI and AMT, and it was concluded that the F3-30 has the sufficient durability for TBO extension to the next step.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.