Abstract
Bank erosion consists of two processes: basal erosion due to fluvial hydraulic force and bank failure under the influence of gravity. Because bank resistance force varies with the degree of saturation of bank material, the probability of bank failure is the probability of the driving force of bank failure being greater than the bank resistance force. The degree of saturation of bank material increases with river stage; therefore, the frequency of bank failure is correlated to the frequency of flooding. Consequently, the rate of bank erosion is due to both basal erosion and bank failure, and bank failure is a probabilistic phenomenon. In this paper, for cohesive bank material experiencing planar bank failure, a deterministic approach was adopted for basal erosion analysis, whereas the probability of bank failure was included in the analysis of bank failure. A method for calculating the rate of bank erosion was derived that integrates both basal erosion and bank failure processes, and accounts for the effects of hydraulic force, bank geometry, bank material properties, and probability of bank failure.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.