Abstract

In this paper, we present closed-form expressions, wherever possible, or devise algorithms otherwise, to determine the expectation and variance of a given schedule on a single machine. We consider a variety of completion time and due date-based objectives. The randomness in the scheduling process is due to variable processing times with known means and variances of jobs and, in some cases, a known underlying processing time distribution. The results that we present in this paper can enable evaluation of a schedule in terms of both the expectation and variance of a performance measure considered, and thereby, aid in obtaining a stable schedule. Additionally, the expressions and algorithms that are presented, can be incorporated in existing scheduling algorithms in order to determine expectation-variance efficient schedules.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.