Abstract

HVDC short-circuit calculation standards will be required to simplify the dimensioning and selection of circuit breakers (CBs) in future HVDC networks. This paper proposes new analytical formulas for the calculation of the ac-side contribution through the blocked half-bridge-based converters during pole-to-ground faults in multiterminal HVDC cable networks. Analytic approximations are derived for the steady-state short-circuit currents and the peak of the transient response for point-to-point HVDC links and extended to multiterminal HVDC cable networks with arbitrary grid topology. The results of the proposed expressions are compared with simulations in PSCAD and provide accurate calculations for the transient peak and steady-state values of the ac-side fault current contribution to the prospective CB current.