Abstract

HVDC short-circuit calculation standards will be required to simplify the dimensioning and selection of circuit breakers (CBs) in future HVDC networks. This paper proposes new analytical formulas for the calculation of the ac-side contribution through the blocked half-bridge-based converters during pole-to-ground faults in multiterminal HVDC cable networks. Analytic approximations are derived for the steady-state short-circuit currents and the peak of the transient response for point-to-point HVDC links and extended to multiterminal HVDC cable networks with arbitrary grid topology. The results of the proposed expressions are compared with simulations in PSCAD and provide accurate calculations for the transient peak and steady-state values of the ac-side fault current contribution to the prospective CB current.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.