Abstract

It was Optimizing resources to analyze cost efficiency in implementing construction projects. One method that can be used for resource optimization is value engineering (VE). Value engineering (VE) as a management technique to determine the efficiency between the cost and performance of a product or project and stay on appearance, quality and maintenance. Then value engineering is applied to the construction of apartment buildings to get cost efficiencies from the initial budget planning. This study aims to determine the effectiveness of value engineering in the construction of apartment buildings, especially in-wall installations. The VE method consists of five stages: Information stage, the creativity stage, the analysis stage, the development stage, and the presentation stage. Information stage, data collection in the form of cost planning, detail engineering design, work plan and terms. Based on the data obtained, the total contract value for the apartment building is Rp. 87,328,000,000. wall installation as one of the highest cost contributors. There are two alternative recommendations, namely sandwich panel walls and precast walls. The analysis found that the sandwich panel wall has the most efficient value, namely the total RAB value of 2.5% from the initial plan.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.