Abstract

Settlement calculation of composite foundation is a hot field in geotechnical engineering research . In the paper with an engineering example, useing the equivalent natural settlement calculation methods and weighted modulus settlement calculation methods to calculate the settlement of composite foundations combined by CFG pile and concrete ramming enlarge pile, which compared with the practical measurement result . The results show that the errors of calculated value of the equivalent natural settlement calculation method were permitted and suitable for calculating composite foundation settlement.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.