Abstract

Many present-day industrial power systems have combined ac/dc power distribution systems. A typical example is a coal mine power system, where ac is used for running the mining equipment and dc is used for track haulage, etc. Also, the topology of the dc network is constantly changing due to the movement of locomotives along the track. Methods are described that can be used to carry out load-flow and short-circuit analyses of such a system.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.